4,500 ft² developed for the phased renovation of an occupied residential lobby.
Drawing from the monumentality of the MetLife Building and the disciplined modernism of the Seagram Building, Doreon developed the custom epoxy terrazzo to complement the tone, scale, and visual weight of the travertine.
Shore Towers remained occupied throughout construction, requiring the work to be completed in three phases while maintaining resident access and coordinating with building operations.
From design development through final polish, the entire terrazzo scope was completed by Doreon’s in-house staff to preserve quality, continuity, and control.

Go behind the scenes to see how the Shore Towers terrazzo was developed, coordinated, and installed. Explore the material studies, phased installation, and technical decisions that carried the work through final polish.
explore behind the build →Tell us about the space, project stage, schedule, and material direction. Doreon will review the requirements and help determine the appropriate next step.
discuss your project →